COMMERCIAL & RETAIL PROJECTS
|
Mulberry Square Addition
Grapevine, Texas |
|
| Platting, surveying, and concept plans for 23-acre commercial retail site at Glade Road and S.H. 121. | |
|
Allen Central Replat
Allen, Texas |
|
| Research and boundary survey for 71.653 acres, intersection right-of-way design details, coordination with state and city officials. | |
|
Arlington, Texas |
|
| Civil site improvements. | |
|
Arlington Tech Centre Nissan Site
Arlington, Texas |
|
| Construction phase administration for 110-acre office retail center and civil site improvements for Nissan Dealership. | |
|
Arlington, Texas |
|
| Civil site improvements, four acre, shopping center. | |
|
Bridgewood Village Tom Thumb
Fort Worth, Texas |
|
| Civil site improvements design for 80-acre mixed use development at northwest corner of I-30 and 820 and 20 acre Tom Thumb anchor tenant. | |
|
Burger King Restaurant
Arlington, Texas |
|
| Topographic survey, coordination of final plat approval, site plan, grading and drainage plan, pavement and other details for 1.456 acres. | |
|
Carrollton Square
Carrollton, Texas |
|
| Civil site improvements. | |
|
Cedar Hill Crossing
Cedar Hill, Texas |
|
| Plating and civil site improvements for 75-acre convenience retail center. | |
|
Central Center
Plano, Texas |
|
| Civil site improvements for 32-acre office retail center and theater anchor tenant. | |
|
Irving, Texas |
|
| Civil site improvements for hotel at southeast corner Valley View Lane and Airport Freeway. | |
|
Food Lion Grocery Store Sites
Various |
|
| Platting, boundary surveys, topographic, as-built surveys, feasibility studies, civil site improvement plans for 15 Food Lion Store Sites in the North Central Texas area. | |
|
Grand Prairie, Texas |
|
| Site planning, platting, and civil site improvements for shopping center. | |
|
Mansfield, Texas |
|
| 28-acre Retail Shopping & Restaurant Center at US Highway 287 and Walnut Creek. Services provided include platting, surveying, HEC-RAS analysis, FEMA submission, TxDOT exit ramp modifications and civil infrastructure improvements. Project consisted of a 57,000 sq. ft. Tom Thumb building and 45,000 sq. ft. of retail space. In addition, four pad sites were developed for approximately 43,000 sq. ft. of future restaurant and retail. | |
|
Marriott Arlington Hotel
Arlington, Texas |
|
| Civil improvements for the redevelopment of the Seven Seas site adjacent to Ranger Stadium for a 16-story Marriott Arlington Hotel. | |
|
Walgreen's Sites
Arlington, Texas |
|
| Platting, surveying, and civil site improvements for six commercial retail sites for Walgreen's Phase 1 expansion; feasibility studies for six additional sites for Phase 2. | |
|
Mulberry Square Addition North Texas Convenience Stores
Grapevine, Texas |
|
| Platting, surveying, grading, and civil site design, driveway access plans for Hansom Hank's site. | |
|
Arlington, Texas |
![]() |
| Platting, surveying, grading and civil site improvements to serve a 17 acre retail commercial development including a Kroger store anchor. | |
|
Rockwall Towne Centre
Rockwall, Texas |
|
| Civil site improvements. | |
|
Arlington, Texas |
|
| Site planning, boundary and topographic surveys, platting, public improvement plans, site plan design, pollution prevention plan design, TxDOT coordination, FEMA coordination, USCOE coordination for 42 acres located at Scots Legacy and Arbrook Boulevard. | |
|
Skaggs Supercenter
Bedford, Texas |
|
| Civil site improvements for Skaggs Supercenter at F.M. 157/Spur 350. | |
|
Southlake Marketplace
Southlake, Texas |
|
| Platting and civil site improvements for Phase One of the 15-acre retail commercial center (Albertson's anchor tenant) at Southlake Blvd. and Davis Blvd. | |
|
Southpark Shopping Center Tom Thumb
Tyler, Texas |
|
| Civil site improvements, 80-acre shopping center, and Tom Thumb anchor tenant. | |
|
Southridge
Denton, Texas |
|
| Phase II civil site improvements and utility extensions/pad site improvements for Chili's Restaurant. | |
|
The Crossroads of DFW
Grapevine, Texas |
|
| Platting, infrastructure, Master Development Plan, and site improvements for 18-acre restaurant and retail commercial center. Civil site improvement plans for California Pizza Kitchen and Don Pablo's Restaurant sites. | |
|
Grapevine, Texas |
|
| Topographic survey, driveway permit and plans, replatting, Amend Master Development Plan, local plans representative for California Pizza Kitchen site. | |
|
Grapevine, Texas |
|
| Topographic survey, site planning, grading and drainage plans, utility plans, pavement and other details for Don Pablo's Restaurant site. | |
|
Grapevine, Texas |
|
| Topographic survey, Amended Master Development Plan; site planning, grading and drainage plans, pavement and other details, utility plans and specifications for Red Robin Restaurant site. | |
|
Mansfield Highlands
Mansfield, Texas |
|
| Surveying, planning, platting and infrastructure design for a 32-acre commercial center encompassing approximately 4000 feet of commercial frontage on Hwy 287. | |

